
Commercial Epoxy Flooring Specified For Your Traffic
Commercial work is a scheduling problem as much as a flooring problem. We specify the system around your traffic, chemicals and downtime tolerance, then install in phases so the business keeps moving.
Systems By Environment
The right build thickness and topcoat depend entirely on what rolls, spills and drops on the floor.
Warehouse And Distribution
Heavy-build systems with lane striping and forklift-rated wear resistance.
Service And Auto
Chemical-resistant topcoats that shrug off oil, coolant and brake fluid.
Food Service
Seamless, sanitary, slip-resistant surfaces with coving at the walls.
Customer-Facing Space
Retail and showroom finishes that photograph well and clean fast.
Minimizing Downtime
Nights, weekends and sectioned phases are standard. Fast-cure topcoats can put a section back in service the same day.
Documentation And Compliance
Product data, slip-resistance options and maintenance instructions are provided so your facility team has what it needs.
Commercial Epoxy Flooring FAQ
- Can you work overnight?
- Yes. Phased overnight and weekend installs are the norm for occupied facilities.
- How do you handle forklift traffic?
- Heavier build thickness and a topcoat rated for abrasion, plus joint detailing where wheels cross.
- Do you add safety striping and markings?
- Yes — lanes, walkways, hazard markings and zone colors can be coated in.
Ready To TransformYour Space?
Tell us about your project and get started with a free estimate.
Requests go straight to Prestigeepoxyaz@gmail.com · (928) 263-0184
Prestige Epoxy & More

